Mdot traffic i 755/12/2023 ![]() This application features location-based alerts, traffic camera streaming, hazard reporting abilities, emergency information, customized map view and easier login with social media. Plans are currently in development and anticipated to be completed in mid-2022. Designed as a mobile companion for is the MDOT Traffic App - available as a free download from the App Store or Google Play. Other work includes culvert replacements, tree clearing, sign replacement, and new pavement markings.ĭuring this work, traffic will be maintained on US-23 using traffic regulators and temporary traffic signals. The center left turn lane will end just northwesterly of Stimpson Road, and passing flares are planned to be built at Mackinaw Mill Creek Campground and at the Mill Creek Discovery Park Entrance. In 2023, the entire roadway will be reconstructed. MDOT will continue work in the village of Mackinaw City by rebuilding US-23 from Huron Avenue southeasterly approximately 3.3 miles to the Mill Creek Discovery Park entrance in Cheboygan County. Primarily, I-75 traffic will be maintained with lane closures and traffic shifts however, at times, I-75 traffic will also be detoured using local routes. This detour will be in place for most of the construction season, from spring until fall. Other work includes detour route paving, drainage improvements, tree removal, sign replacement, and new pavement markings.ĭuring the work on the southbound US-23 bridge over I-75, southbound US-23 traffic will be detoured on local streets, including Jamet Street, Louvigny Street, Central Avenue, and Nicolet Street. US-23 will be rebuilt from I-75 to Huron Avenue, a project that will include replacing the bridge superstructure for southbound US-23 over I-75, eliminating the existing boulevard between Old US-31 Highway and Nicolet Street, and replacing the traffic signal at Nicolet Street. MDOT officials say that during the closure, northbound I-75 traffic will be detoured west on I-696 to northbound M-1 (Woodward Avenue), then eastbound Square Lake Road back to northbound I-75. I-75 will be resurfaced from Old M-108 north to the Mackinac Bridge, and the bridges over the Northwestern State Trail and Central Avenue will have maintenance work completed. The Michigan Department of Transportation (MDOT) is currently preparing to begin road and bridge repair and rebuilding work on I-75 and US-23 in the village of Mackinaw City in both Emmet and Cheboygan counties.
0 Comments
Leave a Reply. |